I have read all the concrete posting I can find, but have a question about the transition from 1) to 2) below.
1) Initial drying - for site poured concrete, in one posting using RH=97% approx as the Initial Conditions and "Concrete w/c 0.5" was suggested.
2) Ongoing behavior - in another posting, reference is made to "Hygrothermal Properties and Behaviour of Concrete" and splitting the concrete into two layers: weather side with with "Liquid Transport" settings untouched and the non-weather side without "Liquid Transport=0".
My questions are:
Do I transition from 1) to 2) by running 1) for say 3 month, then using the end of simulation Temp/RH profile=Initial Conditions for 2) which runs for 3 or 5 year etc?
When modelling a suspended concrete floor that is not exposed to sun or rain after the first 3 months, can I just use Temp and RH data, or do I also need to use the Liquid Transport=0?
Thank you for your continued support.