Assigning Layers in Historical Building
Posted: Mon Jul 18, 2022 2:03 am -1100
Hi,
I am working on a historical building in the Wufi plus program.
In the historical building where I work, the floor beams are spaced every 50 cm. How should I enter this while entering the layer? Like a appendix 1
Again, in the historical building, the wooden wall coverings do not reach the ceiling. There's plaster bits up on the wall. How can I assign it in layer? Like a appendix 2
There are built-in wardrobes on many walls of the historical building. About 30cm deep. How should the air gap here be defined when layering?
Best Regards
Istanbul Technical University Environmental Control and Building Technology MSc
I am working on a historical building in the Wufi plus program.
In the historical building where I work, the floor beams are spaced every 50 cm. How should I enter this while entering the layer? Like a appendix 1
Again, in the historical building, the wooden wall coverings do not reach the ceiling. There's plaster bits up on the wall. How can I assign it in layer? Like a appendix 2
There are built-in wardrobes on many walls of the historical building. About 30cm deep. How should the air gap here be defined when layering?
Best Regards
Istanbul Technical University Environmental Control and Building Technology MSc